Shop Progress

The shop has also been materializing out there before our very eyes. Prior to the San Antonio trip, we got the footings dug, the foundation prepared:





and the concrete poured and finished.



Since coming back, we've had framers working for a couple of weeks,



and as of last Saturday, the entire Phase 1 (80' x 40') is framed in and sheeted.





Next steps? Approval of the permit for Phase 2 (20' x 40'), framing in that phase and then stucco-ing and roofing the whole thing.

It's crazy to look back there and see that huge building where nothing was a few short months ago..